-Thamalakane dries up, throws Maun into a frenzy
-Maun Water woes back to haunt residents
-Borolong Water Treatment Plant might be shut down anytime
– Various sectors of the Maun economy, domestic users to struggle
Persistent chronic water shortages in Maun are to worsen following the drying up of one the major sources of water in Maun, Thamalakane River. Maun water supply has over the years been failing to meet demand, even when Thamalakane River is in its glory.
Water Utilities Corporation (WUC) Head of Business Centre in Maun, Thabo Ndadi has confirmed that the Borolong Water Treatment Plant which draws water from the Thamalakane River might be shut down anytime soon due to minimal flow in the river.
As a result, Ndadi revealed that the most affected areas will experience low to no water supply and these include Boseja, Matlapana, Disaneng and Matshwane.
“To ensure equitable distribution of supply from the remaining sources of Kunyere, Shashe and Gogomoga well fields, a ration schedule will be introduced,” Ndadi announced.
Ndadi highlighted that measures put in place to mitigate the water shortage involves a structured water rationing where water will be distributed among wards in Maun on different time slots though there is shortage of infrastructure. He has since advised residents to minimise using water and avoid using hose pipes to wash their cars and to reuse water to water plants for the water to be shared accordingly with households. “People should practice constant cleaning of their water storage tanks to avoid contamination of the water,” he advised.
Ndadi added that water sources and supply infrastructures were insufficient to meet the demand. “Maun generally has water shortage as the supply does not adequately meet the demand and we have been operating on a marginal supply, if there is an eventuality of disruptions, the effects will be felt as we are currently operating at a 20% deficit,” he alerted.
“With the dry lagoon which supply our Borolong plant we only have 65% of water to share among Maun residents,” Ndadi revealed.
He however noted that there are currently two mega projects being implemented to address Maun water shortage in the long term. The first phase of the project deals with improving the infrastructure capability to ensure WUC is able to supply all the demand areas among them erection of new water pipe lines and development of water sanitation.
“The phase two project addresses the already unavailable water sources as they are not adequate hence the drilling and equipping of additional boreholes to meet Maun water requirements,” he indicated.
Some resident of Boseja have said they started experiencing water shortages since last week.
“Normally the taps run dry in the morning and this is something we have become accustomed to. Sometimes taps are dry for the whole day,” Kamogelo Gaahele, a resident of Boseja said. She complained that they have not been getting any communication from the Water Utilities
For his part, the Letsholathebe II Memorial Hospital Public Relations Officer Batisani Mokgethi has assured that the looming water shortage will not affect the hospital’s day to day operations as the hospital has its own water plant. He noted that they are also working hand in hand with the WUC to ensure that the hospital has safe to drink water at all times.
There has also been concerns by some members of the public regarding the quality of the water they drink. They have complained about the brownish colour of the water, which they fear may de signs of pollution.
However, Ndadi has explained that the change water gets its brown colour from water pipes following vandalism by some members of the public and the livestock.
